Holland America Line Completes Shore Power Connectivity Installation Across Fleet

Holland America Line (logo)With the completion of shore power installation on Volendam, Holland America Line’s entire fleet is now shore power-capable.

Volendam completed installation in Vancouver, British Columbia, and connected to the port’s shoreside electricity for the first full day on Sept. 27.

The cruise line began converting ships to have shore power connectivity in 2006 with its four Vista Class ships; its Pinnacle Class ships (Koningsdam, Nieuw Statendam and Rotterdam) all were built with shore power systems installed, and the Signature Class ships (Eurodam and Nieuw Amsterdam) were launched with a partial installation that has since been completed.

Full story Holland America Line Completes Shore Power Connectivity Installation Across Fleet



OTHER RECENT POSTS