Kenya: Balala pessimistic as KPA cruise ship terminal three months late
The construction of a cruise ship terminal at the Port of Mombasa is taking too long and Kenya risks being locked out of the cruise circuit. Tourism Cabinet Secretary Najib Balala said it takes two to three years to arrange a cruise programme and that preparations for the next one were ongoing. (the-star.co.ke)

